Service · 1/500
Detailed plan 1/500 + GIS
Detailed and master site plans: site grading, roads, drainage, water supply, power, lighting, telecommunications and combined utility layout – with a GIS database.
Rendering: architecture and landscape consultants
Process
- ExistingSurvey, check against the zoning plan
- NetworksLevels, alignments, pipes, connections
- CoordinationCombined utility layout, cross-sections
- GISPlan database to the HoSoGIS structure
Deliverables
- Infrastructure plans at 1/500
- Planning report, preliminary quantities
- GIS database
Basis
Law on Urban and Rural Planning 47/2024/QH15 · Circular 16/2025/TT-BXD – Art. 42, Appendix II (GIS database) · QCVN 01:2026/BXD – cl. 1.5.10.2
77 projects
All projects →Selected projects
Rendering: client / architect
L2 · Apartment complexes · 2025–2026Suncity – An Khanh
An Khanh Ward, Ho Chi Minh City · 8.97 ha (≈8.591 dân)
1/20001/500BDDDREVBIMRendering: client / architect
L2 · Apartment complexes · 2026Thuan Thanh Apartments – Skyworld
Block I-8', Binh Phu Ward, Ho Chi Minh City · 0.52 ha
1/20001/500BDDDREVBIMPlan view from drawings – in preparation
L1 · Residential areas · 2024–2025Luong Binh Commercial Housing
Luong Binh Commune, Ben Luc District, Long An Province · 17.67 ha
1/20001/500BDDDREVBIMPlan view from drawings – in preparation
L3 · Civic & special-use areas · 2022Bien Hoa Administrative – Cultural – Commercial Centre
Bien Hoa, Dong Nai Province · 86.9 ha
1/20001/500BDDDREVBIM| Year | Project · location | Area | Sector | Services |
|---|---|---|---|---|
| 2026 | 1/500 Site Plans & GIS Databases, 2026 projects: Lam Ha agri-processing plant, Nghi Son plant, Hang Sam furniture plant, Global Power, Tan Duc Industrial Park factories, Tan Chau inland port, Dai Dong residential, Can Gio – Long Hoa housing, 156 Ly Chieu HoangVarious provinces | Industrial parks | 1/20001/500BDDDREVBIM | |
| 2026 | 48-48A Tran Phu High-end Commercial and Tourism Complex (Poulo Condor) – master site plan (infrastructure)48-48A Tran Phu, Nha Trang Ward, Khanh Hoa Province | 0.364 ha | Tourism & resorts | 1/20001/500BDDDREVBIM |
| 2026 | Hoan My Hospital site plan & GIS; An Hoi Dong high-rise housing; 9X An Suong residentialHo Chi Minh City | Apartment complexes | 1/20001/500BDDDREVBIM | |
| 2026 | Thu Duc Zone 4 – Block 4.14.4.HH (police housing) – 1/500 master site planTang Nhon Phu Ward, Ho Chi Minh City | Apartment complexes | 1/20001/500BDDDREVBIM | |
| 2025 | 1/500 Detailed Plan Adjustments – Thien Loc Thanh and Savi Industrial ClustersCan Duoc, Tay Ninh Province (formerly Long An) | 33.26 ha | Industrial parks | 1/20001/500BDDDREVBIM |
| 2025 | Cua Lo Hotel, Commercial and Luxury Villa Complex – 1/500 detailed plan adjustmentCua Lo, Nghe An Province | Tourism & resorts | 1/20001/500BDDDREVBIM | |
| 2025 | Duc Tan Outdoor Tourism Area – simplified 1/500 infrastructure planTien Hoa Hamlet, Tien Thanh Commune, Phan Thiet, Lam Dong Province (formerly Binh Thuan) | Tourism & resorts | 1/20001/500BDDDREVBIM | |
| 2025 | Expert Housing and Services, Lots S and H – Saigon Hi-Tech Park (1/500 infrastructure plan adjustment)Tang Nhon Phu Ward, Ho Chi Minh City | Residential areas | 1/20001/500BDDDREVBIM | |
| 2025–2026 | Factory GIS Databases (textile dyeing, rubber-plastics, Sieu Thanh, Vi Gia, Ham Kiem II Industrial Park – Bita's)Various provinces | Industrial parks | 1/20001/500BDDDREVBIM | |
| 2025 | Hiep Binh Chanh Housing Area – 1/500 site plan adjustmentHiep Binh Chanh Ward, Thu Duc, Ho Chi Minh City | Residential areas | 1/20001/500BDDDREVBIM | |
| 2025 | Mixed-use Housing and Offices – 02 Tran Ngoc Dien – 1/500 site plan GIS database02 Tran Ngoc Dien, An Khanh Ward, Ho Chi Minh City | 825.7 m² | Residential areas | 1/20001/500BDDDREVBIM |
| 2025 | Mixed-use Housing and Offices – 12 Tran Ngoc Dien – 1/500 site plan GIS database12 Tran Ngoc Dien, An Khanh Ward, Ho Chi Minh City | 978.9 m² | Residential areas | 1/20001/500BDDDREVBIM |
| 2025 | Nguyen Hue High School Renovation and Extension – simplified 1/500 planLong Thanh My Ward, Thu Duc, Ho Chi Minh City | Civic & special-use areas | 1/20001/500BDDDREVBIM | |
| 2025 | Nguyen Huu Tho Street Housing (Zone 14) – local 1/500 plan adjustmentPhuoc Kien Commune, Nha Be District, Ho Chi Minh City | Residential areas | 1/20001/500BDDDREVBIM | |
| 2025 | Novaworld Phan Thiet (Ocean Valley) – local 1/500 infrastructure plan adjustmentPhan Thiet, Lam Dong Province (formerly Binh Thuan) | Tourism & resorts | 1/20001/500BDDDREVBIM | |
| 2025 | Phu Huu Crushing Plant – 1/500 detailed planLong Truong Ward, Ho Chi Minh City | Industrial parks | 1/20001/500BDDDREVBIM | |
| 2025 | Phuoc Hai Serenity – commercial, serviced apartments, resort villas and hotel – 1/500 infrastructure plan adjustmentPhuoc Hai Town, Long Dat District, Ba Ria – Vung Tau Province | Tourism & resorts | 1/20001/500BDDDREVBIM | |
| 2025 | Phuoc Long B Housing Area (former District 9) – local 1/500 plan adjustmentPhuoc Long Ward, Ho Chi Minh City | Residential areas | 1/20001/500BDDDREVBIM | |
| 2025 | Thien Phuc Vinh Hang Vien Memorial Park – local 1/500 infrastructure plan adjustmentThanh Son and Phuong Dong Wards, Uong Bi, Quang Ninh Province | Civic & special-use areas | 1/20001/500BDDDREVBIM | |
| 2025 | Thuan An Xanh Apartments (Eco Thuan An) – master site planThuan An, Ho Chi Minh City (formerly Binh Duong) | Apartment complexes | 1/20001/500BDDDREVBIM | |
| 2024 | 25D Nguyen Van Dau Housing (Lots B2–B8) – local 1/500 plan adjustmentWard 6, Binh Thanh, Ho Chi Minh City | Residential areas | 1/20001/500BDDDREVBIM | |
| 2024 | Brief for the 1/500 Plan of Dien Khanh Administrative Centre (VCN – SEAPE joint venture)Dien Khanh, Khanh Hoa Province | Civic & special-use areas | 1/20001/500BDDDREVBIM | |
| 2024–2025 | Hiep Phu I.43, Long Binh, Tan Thanh Tay, Tan Chanh Hiep and Thanh Loc Parks – 1/500 plans, site plansHo Chi Minh City | Civic & special-use areas | 1/20001/500BDDDREVBIM | |
| 2024 | Le Phat Factories for Lease – 1/500 site plan GIS databaseLot 24, Road D2, Chau Duc Industrial Park, Ho Chi Minh City (formerly Ba Ria – Vung Tau) | 2.1 ha | Industrial parks | 1/20001/500BDDDREVBIM |
| 2024 | NPK Fertiliser Plant – 1/500 master site plan, Lot D10b, Hiep Phuoc Industrial Park (Phase 2)Hiep Phuoc Commune, Ho Chi Minh City | 8.79 ha | Industrial parks | 1/20001/500BDDDREVBIM |
| 2024–2025 | Rad Tech Viet Nam Factory (Lot C6-12, Ham Kiem I Industrial Park) – 1/500 site plan, fire protection design, building permitHam Thuan Nam, Lam Dong Province (formerly Binh Thuan) | Industrial parks | 1/20001/500BDDDREVBIM | |
| 2023 | Bai Cay Men Complex – 1/500 infrastructure planAn Son Commune, Kien Hai District, Kien Giang Province | Tourism & resorts | 1/20001/500BDDDREVBIM | |
| 2023 | Gio Bien Tourism Area (Ho Tram) – 1/500 infrastructure plan adjustmentPhuoc Thuan Commune, Xuyen Moc District, Ba Ria – Vung Tau Province | Tourism & resorts | 1/20001/500BDDDREVBIM | |
| 2023 | Green Diamond Villa Area – 1/500 infrastructure planAn Phu Ward, Thu Duc, Ho Chi Minh City | Residential areas | 1/20001/500BDDDREVBIM | |
| 2023 | H2-02 Apartments – Cat Lai Residential Area – 1/500 master site plan (infrastructure) and connection approvalCat Lai Ward, Thu Duc, Ho Chi Minh City | Apartment complexes | 1/20001/500BDDDREVBIM | |
| 2023 | Hoan Cau Tourism Area (8.2 ha) – 1/500 infrastructure planPhan Rang – Thap Cham, Ninh Thuan Province | 8.2 ha | Tourism & resorts | 1/20001/500BDDDREVBIM |
| 2023 | Lane 150 Residential Area, Phuoc My Ward – topographic survey and 1/500 plan adjustmentPhuoc My Ward, Phan Rang – Thap Cham, Ninh Thuan Province | 40 ha | Residential areas | 1/20001/500BDDDREVBIM |
| 2023 | Lot E3 Commercial Complex – Rach Gia North-West Urban Area – 1/500 master site plan (local infrastructure adjustment)North-West Urban Area, Rach Gia, Kien Giang Province | Civic & special-use areas | 1/20001/500BDDDREVBIM | |
| 2023 | My Phu Residential Area, Phuoc Long B Ward – 1/500 infrastructure plan adjustmentPhuoc Long B Ward, Thu Duc, Ho Chi Minh City | Residential areas | 1/20001/500BDDDREVBIM | |
| 2023–2024 | SIS Dong Thap Hospital and Convalescent Centre – 1/500 infrastructure planWard 6, Cao Lanh, Dong Thap Province | Civic & special-use areas | 1/20001/500BDDDREVBIM | |
| 2022 | 3/2 Street Extension Commercial Street (MIK Long An) – 1/500 plan adjustment, infrastructure basic and detailed designHau Nghia Town, Duc Hoa District, Long An Province | Residential areas | 1/20001/500BDDDREVBIM | |
| 2022 | Binh Duong Tower Apartments (Zones A, B) – 1/500 infrastructure planNguyen Thi Minh Khai Street, Thuan Giao Ward, Thuan An, Binh Duong Province | Apartment complexes | 1/20001/500BDDDREVBIM | |
| 2022 | Diamond Bay – infrastructure for 1/2000 zoning and 1/500 detailed plansNha Trang, Khanh Hoa Province | Residential areas | 1/20001/500BDDDREVBIM | |
| 2022 | Dinh Bo Linh Corridor Housing, Ward 26 – 1/500 infrastructure plan adjustmentWard 26, Binh Thanh, Ho Chi Minh City | 27.3 ha (theo tên tệp HĐ) | Residential areas | 1/20001/500BDDDREVBIM |
| 2022 | Duc Trung – Thuan Dao Commercial Housing (2.5 ha) – 1/500 plan, basic and detailed designBen Luc Town, Ben Luc District, Long An Province | ≈2.5 ha | Residential areas | 1/20001/500BDDDREVBIM |
| 2022 | HCMC Workers' Cultural Palace – 1/500 infrastructure planHo Chi Minh City | Civic & special-use areas | 1/20001/500BDDDREVBIM | |
| 2022 | North Dinh Bo Linh Housing Area, Ward 26 – 1/500 infrastructure plan adjustmentWard 26, Binh Thanh, Ho Chi Minh City | Residential areas | 1/20001/500BDDDREVBIM | |
| 2022 | Phu Huu Housing Area (Thu Duc) – 1/500 detailed plan adjustmentPhu Huu Ward, Thu Duc, Ho Chi Minh City | Residential areas | 1/20001/500BDDDREVBIM | |
| 2022 | Thanh Da Trade Union Hotel Upgrade – 1/500 infrastructure planWard 27, Binh Thanh, Ho Chi Minh City | Tourism & resorts | 1/20001/500BDDDREVBIM | |
| 2022 | Thanh Phu 3 Residential Area – 1/500 detailed planThanh Phu Commune, Ben Luc District, Long An Province | Residential areas | 1/20001/500BDDDREVBIM | |
| 2022 | Workers' Housing Area, Nhon Trach Industrial Park – 1/500 detailed plan adjustmentHiep Phuoc Town, Phuoc Thien Commune, Nhon Trach, Dong Nai Province | ≈10 ha (theo danh sách dự án… | Residential areas | 1/20001/500BDDDREVBIM |
| 2021 | BIVID Pharmaceutical Plant (Lot I-9-1, Hi-Tech Park) – 1/500 infrastructure plan adjustmentSaigon Hi-Tech Park, Thu Duc, Ho Chi Minh City | Industrial parks | 1/20001/500BDDDREVBIM | |
| 2021 | Chung Shing Textile Integrated Yarn and Garment Facility – 1/500 detailed plan adjustmentNhut Chanh Commune, Ben Luc District, Long An Province | 30 ha | Industrial parks | 1/20001/500BDDDREVBIM |
| 2021 | Long Cang 2 Residential Area – 1/500 plan, basic and detailed designLong Cang Commune, Can Duoc District, Long An Province | 5.4 ha (Project List) | Residential areas | 1/20001/500BDDDREVBIM |
| 2021 | Nui Chua High-end Eco-tourism Area (Zones A1–A3, Bai Cha La) – local 1/500 infrastructure plan adjustmentCong Hai and Vinh Hai Communes, Ninh Thuan Province | 46.90 ha (468.966 m²) | Tourism & resorts | 1/20001/500BDDDREVBIM |
| 2021–2023 | OneHub Saigon Complex – 1/500 plan, transport plan; infrastructure basic and detailed design (grading, roads, stormwater)Lot C1, Saigon Hi-Tech Park, Thu Duc, Ho Chi Minh City | 4.42 ha | Civic & special-use areas | 1/20001/500BDDDREVBIM |
| 2021–2022 | Vam Co Dong Southgate New Urban Area – sub-zones B1, C1, B2, E2 (1/500 infrastructure plan adjustments)An Thanh Commune, Ben Luc District, Long An Province | Residential areas | 1/20001/500BDDDREVBIM | |
| 2021 | Xuan Thao My Yen Housing AreaMy Yen Commune, Ben Luc District, Long An Province | 3.85 ha | Residential areas | 1/20001/500BDDDREVBIM |
| 2020 | Binh Duong Commercial Centre and Luxury Apartments (Zones A, B) – 1/500 infrastructure plan and connection schemeBinh Duc, Binh Hoa Commune, Thuan An, Binh Duong Province | Apartment complexes | 1/20001/500BDDDREVBIM | |
| 2020 | Thanh Xuan 1 Industrial Cluster (50 ha) – 1/500 detailed plan adjustment and topographic surveyMo Cong Commune, Tan Bien District, Tay Ninh Province | ≈50 ha (theo tên HĐ) | Industrial parks | 1/20001/500BDDDREVBIM |
| 2019–2020 | Cho Tram New Residential AreaMy Le Commune, Can Duoc District, Long An Province | 3.85 ha | Residential areas | 1/20001/500BDDDREVBIM |
| 2019–2020 | Duc Hoa Urban Residential Area – Phase 1Tan My Commune, Duc Hoa District, Long An Province | 20.75 ha | Residential areas | 1/20001/500BDDDREVBIM |
| 2019 | Long Cang Residential Area (Phase 1, low-income housing) – 1/500 detailed planLong Cang Commune, Can Duoc District, Long An Province | 9.38 ha | Residential areas | 1/20001/500BDDDREVBIM |
| 2019–2020 | Phuc An Commercial Residential Area and ExtensionMy Hanh Nam Commune, Duc Hoa District, Long An Province | 90 ha | Residential areas | 1/20001/500BDDDREVBIM |
| 2019 | Tan My Golf Course CentreTan My Commune, Duc Hoa District, Long An Province | 4.17 ha | Residential areas | 1/20001/500BDDDREVBIM |
| 2019–2020 | Thanh Phu 2 Residential AreaThanh Phu Commune, Ben Luc District, Long An Province | 4.33 ha | Residential areas | 1/20001/500BDDDREVBIM |
| 2019–2020 | Tran Anh Villa New Urban AreaWard 5, Tan An, Long An Province | 53.93 ha | Residential areas | 1/20001/500BDDDREVBIM |
| 2018 | C.T.C Residential Area – 1/500 infrastructure planTo be confirmed | Residential areas | 1/20001/500BDDDREVBIM | |
| 2018 | Dien Duong Tourism AreaDien Duong Ward, Dien Ban, Quang Nam Province | 7.02 ha | Tourism & resorts | 1/20001/500BDDDREVBIM |
| 2018 | Duc Hoa Urban Residential Area (whole area, 1/2000 zoning adjustment)Tan My Commune, Duc Hoa District, Long An Province | 74.04 ha | Residential areas | 1/20001/500BDDDREVBIM |
| 2018 | Phuoc Long B Housing Area – 1/500 detailed plan adjustment, District 9Phuoc Long B Ward, Thu Duc, Ho Chi Minh City | 4.31 ha | Residential areas | 1/20001/500BDDDREVBIM |
| 2018 | Viet Uc Residential AreaLuong Hoa Commune, Ben Luc District, Long An Province | 20.55 ha | Residential areas | 1/20001/500BDDDREVBIM |
| 2017 | Thoi An Residential Area – 1/500 infrastructure plan (drafting services)To be confirmed | Residential areas | 1/20001/500BDDDREVBIM | |
| 2017 | Zone A Film Studio and Eco-tourism – Trang Co Bu Lach Tourism AreaDong Nai Commune, Bu Dang District, Binh Phuoc Province | 347.62 ha | Tourism & resorts | 1/20001/500BDDDREVBIM |
| 2016 | Carava ResortNorth Cam Ranh Peninsula, Khanh Hoa Province | 22.62 ha | Tourism & resorts | 1/20001/500BDDDREVBIM |
| 2016 | Hoang Hoa Residential Area (landslide resettlement, Hamlet 4, Long Hau)Hamlet 4, Long Hau Commune, Can Giuoc District, Long An Province | 1.39 ha | Residential areas | 1/20001/500BDDDREVBIM |
| 2016 | Hon Tam Island Tourism Area (1/500 detailed plan adjustment)Vinh Nguyen Ward, Nha Trang, Khanh Hoa Province | 24.23 ha | Tourism & resorts | 1/20001/500BDDDREVBIM |
| 2016 | Samsung HCMC CE Complex (1/500 detailed plan adjustment)Saigon Hi-Tech Park, Thu Duc, Ho Chi Minh City | 93.86 ha | Industrial parks | 1/20001/500BDDDREVBIM |