Service · BIM
Infrastructure BIM
Infrastructure BIM consulting: modelling, clash detection, BIM model review, quantities and scheduling; BIM execution plans (BEP), employer's information requirements (EIR) and common data environments (CDE) to TCVN ISO 19650. SEAPE has used infrastructure BIM since 2014 on the Tay Ho Tay New Urban Area.
Deliverables
- Infrastructure BIM models
- Clash detection reports
- BIM model review
- Quantities and schedules from the model
- BEP, EIR, CDE to TCVN ISO 19650
6 projects
All projects →Selected projects
L1 · Residential areas · 2024
Waterpoint Urban Area – trunk infrastructure BIM
Long An Province · 359.26 ha
1/20001/500BDDDREVBIMPlan view from drawings – in preparation
L4 · Industrial parks · 2024VSIP Quang Ngai Industrial Park – Phase 1
Dung Quat Economic Zone, Quang Ngai Province · 497.68 ha
1/20001/500BDDDREVBIML1 · Residential areas · 2013–2014Tay Ho Tay New Urban Area (Starlake)
Tay Ho / Bac Tu Liem, Hanoi · 207.6 ha (mô tả ghi 208 ha); hồ điều…
1/20001/500BDDDREVBIM| Year | Project · location | Area | Sector | Services |
|---|---|---|---|---|
| 2021 | Hyatt Centric Cam Ranh – infrastructure BIM modelCam Ranh Bay, Khanh Hoa Province | 9.41 ha | Tourism & resorts | 1/20001/500BDDDREVBIM |
| 2019 | Hoa Sen Dai Phuoc – Zone 8, Phase 2 (drainage BIM)Dai Phuoc Commune, Nhon Trach District, Dong Nai Province | 30.61 ha | Residential areas | 1/20001/500BDDDREVBIM |
| 2015 | Hang Xanh Flyover BIM ModelHang Xanh junction, Binh Thanh, Ho Chi Minh City | 391.5 m | Roads & bridges | 1/20001/500BDDDREVBIM |