Road design, site grading, earthwork balance and stormwater drainage at the preliminary design stage of the Qaisar – Dara-i-Bum ring road, Afghanistan, 2017; about 150 km.
Scope
Road design, site grading and earthwork balance, and stormwater drainage design at the preliminary design stage of the ring road (Preliminary Design of Ring Road), under Grant 0355-AFG (Transport Network Development Investment Program).
- Location
- Afghanistan
- Size
- Chainage 190+000 – 341+894.83, about 150 km
- Client
- Ministry of Public Works of Afghanistan (MPW) and Asian Development Bank (ADB)
- Year
- 2017
- Programme
- Grant 0355-AFG – Transport Network Development Investment Program
- Stage
- Preliminary design (Preliminary Design of Ring Road)
- Source
- Preliminary design drawing (Preliminary Design of Ring Road)