Qaisar – Dara-i-Bum Road (Ring Road, Afghanistan)

Afghanistan

Basic + detailed designKey staff experience

Road design, site grading, earthwork balance and stormwater drainage at the preliminary design stage of the Qaisar – Dara-i-Bum ring road, Afghanistan, 2017; about 150 km.

Scope

Road design, site grading and earthwork balance, and stormwater drainage design at the preliminary design stage of the ring road (Preliminary Design of Ring Road), under Grant 0355-AFG (Transport Network Development Investment Program).

Location
Afghanistan
Size
Chainage 190+000 – 341+894.83, about 150 km
Client
Ministry of Public Works of Afghanistan (MPW) and Asian Development Bank (ADB)
Year
2017
Programme
Grant 0355-AFG – Transport Network Development Investment Program
Stage
Preliminary design (Preliminary Design of Ring Road)
Source
Preliminary design drawing (Preliminary Design of Ring Road)
Plan and profile, chainage 190+000 – 199+600
Plan and profile, chainage 190+000 – 199+600 Preliminary design drawing (Preliminary Design of Ring Road)